CBNME: AKEM Group erects first of six Raimondi topless tower cranes in Bursa, Turkey

CBNME: AKEM Group erects first of six Raimondi topless tower cranes in Bursa, Turkey

In The Press: 12 November 2018

Official Raimondi Cranes agent of Turkey, AKEM Group, erected a MRT159 crane on the Downtown Bursa jobsite as the first of a total of six topless tower cranes planned for the project. Currently at work, the Raimondi MRT159 with a Height Under Hook (HUH) of 48 meters and a jib length of 65 meters, will reach a final HUH of 98 meters with two collars. The cranes are all rented by the project developer from the AKEM Group fleet, and are planned to be operational for varying periods ranging from 20-28 months. The site planning configuration regime includes four additional 8-tonne Raimondi MRT159s with final HUHs of 80 meters and one collar each, all with an initial HUH of 60 meters and jibs lengths of 65 meters.

Read the full feature online