HeavyQuip Magazine: Assistedile Trusts in Raimondi Flat-Top Tower Cranes To Elevate Torre Milano Residential Development

HeavyQuip Magazine: Assistedile Trusts in Raimondi Flat-Top Tower Cranes To Elevate Torre Milano Residential Development

In The Press: 24 May 2021

Two Raimondi flat-top tower cranes are now at work on Milan’s newest residential tower installed by official agent Assistedile. The new topless MRT189 and an existing MRT102 are currently participating in the development of Torre Milano, a residential development clocking in at 80-meters in height.

“The decision to choose these two heavy lifters for this specific project was taken with the support of the client, Nessi & Majocchi Spa, after several evaluations of the jobsite location and project specifications. Hence, we rented the Raimondi MRT189 due to its high performances in terms of productivity, large load capacity, and fast assembly, while the MRT102 was chosen as the support machine in the supply of materials,” said Luciano Friso, Chief Executive Officer, Assistedile.

Read the full article online